All projects

Garryruth, Cloonbeg, Tralee, Co. Kerry

19-Unit Residential Development – Slí Chluain Bheag, Tralee

Client
Kerry County Council
Location
Garryruth, Cloonbeg, Tralee, Co. Kerry
Project Type
Local Authority Housing / Urban In-Fill (19 Units)
Our Role
Full Mechanical, Plumbing, and Renewable Energy Installation

Project Overview

Working in partnership with main contractor Eamon Costello (Kerry) Ltd, our team successfully delivered a comprehensive mechanical, plumbing, and sustainable heating package for Slí Chluain Bheag, a high-profile urban in-fill housing scheme in Tralee.

The contract required a highly efficient, multi-tiered renewable specification across three distinct building blocks (18 apartments and 1 detached bungalow). We managed the precise deployment of distinct heating technologies—ranging from traditional Air-to-Water heat pumps to advanced Exhaust Air Heat Pumps (EAHP)—to meet strict Part L building regulations and maximise energy efficiency for every layout.

Our Detailed Scope of Work

01

Advanced Renewable Heating & Hot Water Systems

  • Hybrid Renewable Strategy

    Supplied, installed and commissioned a hybrid renewable energy strategy across all 19 units in accordance with the mechanical engineering specifications.

  • Detached Bungalow (No. 1)

    Installed a high-performance 4kW Hisense Air-to-Water heat pump paired with a dedicated Mechanical Extract Ventilation (MEV) unit for climate and indoor air quality management.

  • Block A Apartments (A11, A13, A14, A17 & A18)

    Supplied and fitted 4kW Hisense Air-to-Water heat pumps alongside integrated MEV units to service these specific layouts.

  • Block A & B Exhaust Air Heat Pumps

    Deployed 3.5kW Exhaust Air Heat Pumps (EAHP) across 13 apartments: A10, A12, A15, A16, A19 and B2–B9. These compact units serve as both the ventilation extract system and the primary heating and hot water source by recovering heat from each apartment’s exhaust air.

02

Full Domestic Water & Wastewater Services

  • Pipework Infrastructure

    Supplied and installed all primary Mains Water Services (MWS), hot and cold water distribution pipework, and complete sub-floor and internal structural plumbing.

  • Drainage Engineering

    Formed all soil, waste and wastewater ventilation systems, integrating multi-storey apartment drainage stacks cleanly within the traditional masonry structure.

03

Sanitary Ware & Fit-Out

  • First & Second Fix Plumbing

    Executed the complete installation and pressure-testing of all high-quality bathroom sanitary ware across all 19 units.

  • Accessibility Plumbing

    Completed specialised sanitary ware fit-outs within the detached bungalow to comply with local authority universal accessibility guidelines.

  • Kitchen Services

    Plumbed and connected multi-point kitchen sinks, mixing valves, and utility waste and supply lines for washing machines.

Installation Photos

Site photography will be added here. Each slot below marks the shot it will hold.

Back to all projectsBack to Home