All projects

Killarney, Co. Kerry

Luxury Guestroom Bathroom Remodels – The Great Southern Hotel, Killarney

Main Contractor
Ladden Construction
Client
The Great Southern Hotel
Location
Killarney, Co. Kerry
Project Type
Commercial Hospitality Renovation & Luxury Fit-Out (21 Premium Rooms)
Our Role
Complete Sanitary Ware Decommissioning, First & Second Fix Plumbing Infrastructure

Project Overview

Partnering once again with main contractor Ladden Construction, our team successfully delivered a phased, high-specification plumbing and mechanical remodel for 21 luxury guestrooms across multiple floors of the historic Great Southern Hotel in Killarney.

The project demanded precision engineering to seamlessly integrate modern, concealed luxury plumbing technology and high-end fixtures into an active, premium hospitality environment. Working across three distinct room configurations, we executed everything from technical first-fix pipe routing to the second-fix installation of high-end client-supplied sanitary ware.

Our Detailed Scope of Work

01

Decommissioning & Infrastructure Preparation

  • Safe Isolation

    Disconnected existing water supplies and waste circuits across all designated guestrooms to allow for safe structural strip-outs.

  • First-Fix Upgrades

    Designed and installed brand-new hot and cold water supply feeds tailored to the exact layouts of the incoming luxury fixtures.

  • Drainage Integration

    Supplied and installed all new wastewater circuits, core waste lines and level-access shower gullies and traps, tying them securely into the hotel’s existing core drainage infrastructure.

  • Isolation Control

    Supplied and installed premium lever isolation valves on all individual supply pipework lines, complete with clear commercial labeling for simplified future maintenance.

02

Luxury Executive Suites

  • Room Types B, C & C1

    Completed the phased fit-out of 11 rooms across floors 2, 3 and 4.

  • High-End Bath Installations

    Plumbed and balanced luxury freestanding baths, integrating architectural wall-mounted concealed tap networks.

  • Concealed Systems

    Installed heavy-duty concealed toilet frames and flush plates alongside modern wall-hung pans.

  • Premium Showers

    Fitted advanced concealed shower valves paired with high-flow overhead rain heads and secondary handheld hose outlets over level-access shower traps.

  • Vanity Units

    Completed second-fix plumbing on wall-hung vanity units, connecting integrated Wash Hand Basins (WHB) with luxury mixers and exposed chrome bottle traps.

03

Premium Guestrooms

  • Room Types A & A1

    Completed the phased fit-out of 5 rooms on floor 4.

  • Minimalist Finish

    Deployed concealed wall frames for sleek, space-saving toilet pans.

  • Precision Showers & Vanities

    Installed concealed rain shower systems and fitted wall-hung vanity mixers complete with architectural chrome bottle traps.

04

Accessible Luxury Suites

  • Room Types E & E1

    Completed the phased fit-out of 5 rooms on floor 1.

  • Universal Design Compliance

    Supplied and installed specialised Doc M pack toilet and sink networks, ensuring the historic hotel meets modern standards for universal accessibility without compromising on aesthetic quality.

  • Seamless Shaker Style

    Installed level-access shower trays, concealed shower valves and wall-hung vanities adapted for accessible luxury.

Installation Photos

Site photography will be added here. Each slot below marks the shot it will hold.

Back to all projectsBack to Home