All projects

Barr Na Sráide, Cahersiveen, Co. Kerry

11-Unit Residential Development

Main Contractor
Ladden Construction
Location
Barr Na Sráide, Cahersiveen, Co. Kerry
Project Type
Multi-Unit Residential (11 Apartments)
Our Role
Full Mechanical, Plumbing, and Renewable Energy Installation

Project Overview

Working alongside main contractor Ladden Construction, our team delivered a comprehensive mechanical, plumbing, and sustainable heating package for this brand-new 11-apartment development in Cahersiveen.

The project required a highly efficient, Part L-compliant installation tailored for multi-unit modern living, prioritising renewable energy, advanced ventilation, and robust water safety systems.

Our Detailed Scope of Work

01

Renewable Heating & Hot Water Systems

  • Heat Pump Technology

    Supplied and installed high-efficiency 6kW Hisense Air-to-Water heat pumps across the units.

  • Integrated Storage

    Paired the systems with 230-litre integrated cylinder units to ensure consistent, energy-efficient domestic hot water.

  • Space-Saving Installation

    Securely wall-mounted all outdoor heat pump units to maximise ground-level space and aesthetic cleanliness.

02

Advanced Mechanical Ventilation

  • Air Quality Management

    Supplied and installed premium Renson Mechanical Extract Ventilation (MEV) units.

  • Smart Controls

    Fully integrated the ventilation networks with dedicated thermostats for optimal indoor climate control and humidity management.

03

Centralized Water Services & Fail-Safe Plumbing

  • Boosted Water Infrastructure

    Supplied and installed all Main Water Services (MWS), hot, cold, soil, vent, and wastewater pipework networks.

  • Pressure & Storage Solutions

    Fitted a 300-litre boosted cold water storage box to ensure strong, balanced water pressure to all apartments.

  • Fail-Safe Design

    Engineered and installed a mains water bypass system directly to the pump. This guarantees uninterrupted water supply to residents in the event of a pump failure or local power outage.

04

Space Heating, Radiators & Controls

  • Zoned Heating Distribution

    Completed full installation of heating pipework, including the second fixing of advanced manifolds.

  • Heat Emitters

    Supplied and fitted high-output steel radiators across all living spaces.

  • Control Systems

    Supplied and commissioned all central heating controls and room thermostats for precision zone scheduling and maximum energy savings.

05

Sanitary Ware & Fit-Out

  • First & Second Fix Plumbing

    Managed the 1.5-fix and final second-fix installation of all high-quality bathroom sanitary ware.

  • Kitchen Connections

    Installed all kitchen sinks, including dedicated plumbing and waste connections for washing machines.

Installation Photos

Site photography will be added here. Each slot below marks the shot it will hold.

Back to all projectsBack to Home