All projects

Ardfert, Co. Kerry

Educational Facility Mechanical & Plumbing Fit-Out – Ardfert National School, Co. Kerry

Main Contractor
DOR Contract Services
Location
Ardfert, Co. Kerry
Project Type
Institutional / Educational Extension (CPAC Project)
Our Role
Specialised Mechanical Piping, Valve Infrastructure, and Sanitary Fit-Out

Project Overview

Working alongside fit-out and building services specialists DOR Contract Services, our team delivered the internal plumbing, mechanical services, and secondary sanitary installation for the CPAC project at Ardfert National School.

Educational installations demand strict adherence to safety, hygiene, and water temperature control standards. This project allowed our team to showcase its agility in executing high-precision internal pipework distribution, localised water heating systems, and specialised condensate drainage networks within a school environment.

Our defined project boundaries excluded below-ground civil drainage and the external mains water feed into the water tank room.

Our Detailed Scope of Work

01

Internal Water Distribution & Safety Infrastructure

  • Pipework & Fittings

    Supplied and installed all primary internal hot and cold water supply pipework networks, utilising high-durability commercial fittings designed for long-term institutional use.

  • Thermostatic Safety Integration

    Supplied and installed high-grade Thermostatic Mixing Valves (TMVs) across the network to provide precise water temperature regulation, prevent scalding and ensure safety compliance for school children.

  • Pressure & System Protection

    Supplied and fitted all network valves and thermal expansion vessels to stabilise internal system pressures and protect the school’s plumbing assets.

02

Commercial Waste & Air Conditioning Drainage

  • Internal Wastewater Networks

    Supplied and installed all internal waste pipework systems to service classrooms and staff facilities.

  • Mechanical AC Drains

    Engineered and routed dedicated drainage infrastructure specifically designed to safely manage and discharge condensate waste from local Air Conditioning (AC) units.

03

Sanitary Ware & Plant Installation (Second Fix)

  • Sanitary Ware Fit-Out

    Executed the precision installation and connection of all client-supplied sanitary ware, student toilets and washroom fixtures.

  • Sinks & Localised Heating

    Installed utility and classroom sinks, pairing them with specialised under-sink water heaters for instant, localised hot water delivery.

  • Water Boosting Systems

    Installed and commissioned the Cold Water Storage Tank (CWST) and its accompanying mechanical booster pump to maintain uniform mains pressure throughout the new development.

Installation Photos

Site photography will be added here. Each slot below marks the shot it will hold.

Back to all projectsBack to Home